Call Us Today: 708.597.0111

American Energy (Chicago Project)

fifield

To protect their critical power infrastructure, our customer wanted an economical and fast solution for their open buss system that was partially exposed to Chicago’s harsh climate.

We provided them with a high quality design that provided a protected solution that minimized cost and downtime.

MDI Pre- engineered a stainless steel support system that was designed to accommodate cable feeds to each of the 480 volt services.

De-energized utility service & removed the existing buss bar connections for three 480 volt feeds. Field installed support system at each transformer to accommodate the new feeder cables. Installed cables on stainless support system and terminated flex cables with compression fittings.

The compression fittings and transformer connection points were wrapped in high voltage fusing tape for protection from the elements. All installed cables where HI-Pot tested and certified. Detailed As-built 3D Revit & Auto Cad documentation was provided to the customer along with a one year parts and labor warranty. Work was completed ahead of their four day schedule. We provided a professional and high quality installation on time and on budget.

© 2012 MDI Electrical. All Rights Reserved. Privacy Policy - TOS - Sitemap
Designed by Windy City Designs / Strategies